Home About us  |  Services Training  |  VPP Projects Resources  |  Contact us

  Safety Observation Checklist - Construction                                                                   


 

100 WR NA Site PPE - Requirements: Yes No NA Administrative: Use Inc NA Check List (Using or Incomplete)
Hard Hats: 100% or When Required OSHA Partnership - Alliance - VPP Fall Protection:
Eye Protection Contract Agreements - In Written    Fall Protect: Harn - Lany - Anchor
Respirator Protection Site Safety Plan - Safety Manual    Training Records on Fall Prot.
Hearing Protection Safety Rules & Enforced    Competent Per. - Inspect Equipt.
Steel Toe Shoes Jobsite Orientation    Guardrailing
Traffic Vest Emergency Action Plan - Onsite    Falling Object Protection
Other: First-Aid - CPR Responders Scaffold: Frame - Tube - Susp - Mobile
Yes No NA Hazard Assessment: Inspections - Daily  -  Weekly    Competent Per. - Inspect - Traing
Weather Cond: Hot  Cold  Wind    Safety Meetings - Daily  -  Weekly    Lifts: Scissor - Aerial - Fork
Slip - Trip - Fall Hazards Report Near Misses    Other:
Good Lighting  Yes No NA Material Items "Onsite" Ladders: Step - Extension - Other
Falling Objects - Holes OSHA Poster    Set up - Inspected - Train
Absorption (Chem - Bio - Radiation) 300 Log: On-Site - HDQ.          Excavation - Trenching:
Inhalation - Fume, Mist, Dust, Vapors 300 summary (2/1-4/30) posted    Competent Per. - Inspect - Traing
Violence Emerg. Alarm: Voice - Cell - Horn    Utilities called & marked
Impalement Hazards (Nails - Rebar) Emergency Numbers Posted    Protected: Box - Slope - Bench
Traffic: Street, Road, Parking Area First Aid Kit Electric:
Vibration - Ergonomics - Noise Bloodborne Path Kit    Powerlines: Marked - Covered
Yes No NA Type of Work: Com - Resid. Eye Wash Station    GFCI: Port - Wall - Breaker
  Inside                Outside Toilet Facilities    Extention Cords - Temp. Lighting
Number of Floors: Drinking Water    Panels: Covers - Secure - Marked
Shift Work: 1,  2,  3  Site Signage (Front)    Worker Qualified - Lockout
Yes No NA Progress: Stage 1 - 2 - 3 - 4 - 5 Street Workzone and Sign Needed Tools & Equip:Hand - Power - Pn - Hyd
  Demo - Site Clearing Material Safety Data Sheets     Guards - Hose Clip - Insp.
  Excavation - Trenching Co. Safety Manual - OSHA Book Cranes:Tower - Mobile - Hoist
  Concrete - Rest - Form - Chipping Yes No # Sub-Contractor:     Slings & Attach: Mark - Inspect 
   Steel Erection   Number of Sub-Contractors Onsite     Operator Qualified - Trained
  Framing - Truss - Siding - Roofing Safety Person Onsite Confined Space:Type
  HVAC - Electrical - Plumbing Competent Person Onsite     Permit - Monitor - Train - Rescue
  Drywall - Painting Co. Safety Manual - OSHA Book    Workzone: Street - Road - Inter - Park
  Glass - Windows - Trim - Doors Safety Meetings,  Site Inspections         Signage - Worker Vest - WZ Map
  Landscape Safety Training - Workers    Haz. Com:
Yes No NA Safety Training: Sub of Sub Notification to G.C.          List - Prog - Label - MSDS - Traing
  OSHA 30 Hr.- Emp  Supv.  Manage  Fire Extinguishers - First Aid Kit Other:
OSHA 10 Hr.- Emp  Supv.  Manage    MSDS Onsite     Fire Hazard Area's ID - Signage
  Specific: Yes No NA Behavior Observed:         Heavy Equipment - Vehicles
Yes No NA Site Condition:   Jobsite Attitude - Good - Helpful       Weld - Permit - Fire Extg - Watch
  Housekeeping - Good   PPE - Workers Using PPE Properly       Concrete - Underground - Tunnel
   Exits Paths - Maintained     Reported items to the Company         Blasting - Explosives - Qualified
    Fire Extinguishers Provided   Company Rep:       Lead - Asbestos - Mold: Abated
         

Due to the constantly changing nature of government regulations, conditions, and the human factors involved, no safety audit can possibly reveal all conditions existing at the audit site that may lead to injury, property damage, or fines.  Furthermore, no safety audit can possibly render an opinion on conditions existing at the inspection site before or after the performance of the audit. The Company understands that it must also provide or conduct frequent and regular inspections on the job site. The audits performed by Safety Alliance LLC shall be used only to aid not relieve the company in complying with this requirement. Safety Alliance will have no authority to stop, correct or supervise employees but will inform company representative of any specific safety concerns known to it. This is considered a walk through inspection not a comprehesive safety inspection.  This form may not be complete for your site.  You will need to review and revise this form to your type of work. REVISED FORM: 8/6/08

 
 
 
Contractor & Project:                                           Supt.:                              Date: 

Contact us for Information

 

copyright 2008 Safety Alliance LLC | website disclaimer

 

Phone: 1-877-723-0073